International Dredging Review

International Dredging Review
MENUMENU

Pump Conversions Increase Productivity

GIW Industries is offering pump conversion as a way of producing more profitable operation in old inefficient or ineffective pump designs. To operate at peak production levels dredges need more than just functional equipment; they need machinery that runs at optimum level with minimum maintenance. At the heart of this mix is the dredge pump. Cost effective pump performance can boost productivity and play a vital role in maximizing return on investment. Read More

Ziegler is New GIW President

.Dennis Ziegler has been named president and CEO of GIW Industries Grovetown Georgia. He is also president of the Mining Division of KSB parent company of GIW. Read More

Ziegler is New GIW President

Dennis Ziegler has been named president and CEO of GIW Industries Grovetown Georgia. He is also president of the Mining Division of KSB parent company of GIW. Read More

Los Angeles Pier 400 Project In Stage 2

A description of the Port of Los Angeles Pier 400 project on March 11 1998 when Stage 1 was nearly complete and State 2 ready to begin. the article describes a visit to the Great Lakes Dredge and Dock Company dredge Florida and a boat trip around the project including the fill area and the breakwaters. Read More