News

San Francisco Bay/Stockton Navigation Improvement Documents Available for Public Review

The Draft General Reevaluation Report (GRR) and Environmental Impact Statement (EIS) for the San Francisco Bay to Stockton Navigation Improvement Project, prepared by the U.S. Army Corps of Engineers San Francisco District, is available for public review and comment.

The study area is a 13.2 mile length of navigation channel spanning central San Francisco Bay to Avon just east of the Benicia-Martinez Bridge and includes the Pinole Shoal Channel, and the Bulls Head Reach portion of the Suisun Bay Channel.  Although the navigation channels in the study area are authorized to a depth of up to -45 feet mean lower low water (MLLW), the channels are currently maintained to only -35 feet MLLW.   The proposed project includes deepening the existing maintained channel depth of the Pinole Shoal Channel and Bulls Head Reach (Suisun Bay) from -35 feet to -38 feet MLLW, dredging a 2,600 foot sediment trap at Bulls Head Reach with a depth of -42 feet MLLW, plus 2 feet of overdepth, leveling the rock outcrop located to the west of Pinole Shoal from a peak of 39.7 feet MLLW to 43 feet MLLW, and using the dredged material at permitted beneficial reuse sites.

The Draft GRR/EIS is available for review on the Corps’ environmental planning website at: http://www.saj.usace.army.mil/About/DivisionsOffices/Planning/EnvironmentalBranch/EnvironmentalDocuments.aspx

All comments must be submitted between May 10 and June 24.  Questions concerning the Draft EIS can be submitted to SFBaytoStockton@usace.army.mil.

Sign up for Waterway Journal's weekly newsletter.Our weekly newsletter delivers the latest inland marine news straight to your inbox including breaking news, our exclusive columns and much more.