DREDGING CONTRACT NEWS


April 17, 2000 Volume 16, Number 8


NORTH ATLANTIC
DELAWARE
CONTRACT AWARD
DACW61-00-C-0023. MAINTENANCE DREDGING, WILMINGTON HARBOR, CHRISTINA RIVER. Awarded to Norfolk Dredging Company for $1,052,571.30 on April 7, 2000. Contact: Sandi Fletcher, contract specialist, phone 215-656-6915; Philadelphia District, COE, Room 643, 100 Penn Square East, Philadelphia, PA 19107.



MAINE



DACW33-00-B-0011. Bid opening June 13, 2000. MAINTENANCE AND IMPROVEMENT DREDGING EIGHT AND SIX FOOT CHANNEL, SIX FOOT ANCHORAGE, EIGHT FOOT SETTLING BASIN AND 6 FOOT TOWN DREDGING AREA, WELLS HARBOR, WELLS. Maintenance and improvement dredging of the Wells Harbor Federal Project and municipal marina areas. Approximately 180,000 cubic yards of material will be dredged. The Federal Project work includes maintenance dredging of channels and an anchorage, and improvement dredging of a repositioned settling basin. The municipal project work consists of dredging berthing and access areas at the two Municipal landings on the east and west sides of the inner harbor. Dredging will be performed by hydraulic plant with the sand pumped to two beaches, north and south of the harbor inlet. Cost estimate, $1 million to $5 million. Due to environmental and other restrictions, no work at the site will be permitted before September 7, 2000. Duration of work: 120 calendar days. Specifications will be available on or about May 10, 2000. All responsible sources may submit a bid which will be considered by the New England District. Contact: Carol K. Husselbee, 978-318-8424; New England District, COE, 696 Virginia Road, Concord, Massachusetts 01742-2751; email: Carol.K.Husselbee@usace.army.mil;



website: http://www.nae.usace.army.mil/index.html



NEW JERSEY



DACW61-00-B-0010. Bid opening April 27, 2000, 11 a.m. MAINTENANCE DREDGING, SALEM RIVER, NEW JERSEY, STATION 3+600 TO STATION 24+896. Dredging of the channel will be required to a depth of 16 feet plus one foot allowable overdepth with no side or end slopes, to the full project width of 150 feet. No bucket dredging will be permitted for this work. Killcohook disposal area number 2 will be used. Completion time for the project is 120 calendar days. Cost estimate $500,000 to $1 million. One copy of the plans and specifications will be furnished on CD-ROM to each bidder at no charge. Additional copies are $5 each. Bidders will be responsible for paper copies. All requests for a solicitation package should be in writing and sent to the attention of Sandi Fletcher. Fax requests to 215-656-6780 or 215-656-6798. Issue date on or about March 28, 2000. Requests for additional copies of the CD-ROM should be in writing along with a company check which includes your Federal Tax Identification Number, or a Personal Check with Social Security Number or a Driver's License or Money Order, payable to "USACE FINANCE CENTER, MILLINGTON." Include a physical street address, telephone number and fax number. Contact: Sandi Fletcher, contract specialist, phone 215-656-6915; Philadelphia District, COE, Philadelphia Wanamaker Building, Room 643, 100 Penn Square East, Philadelphia, PA 19107.



NEW YORK



DACW51-00-B-0010. Bid opening May 23, 2000, 11 a.m. MAINTENANCE DREDGING, RARITAN RIVER TO ARTHUR KILL CUT-OFF CHANNEL. Removal and satisfactory disposal of all material (approximately 112,000 cy) except ledge rock, lying above the plane of 20 feet below mean low water. The dredged material will be disposed at the historic area remediation site (HARS). Cost estimate, $500,000 to $1 million. Unrestricted. Completion date is 45 calendar days after receipt of Notice to Proceed. Plans and specifications will be available on or about April 21, 2000. The non-refundable cost of the plans and specifications is $30.00 and must be mailed to New York District, U.S. Army Corps of Engineers,26 Federal Plaza, Contracting Division, Room 1843, New York, N.Y. 10278-0090. Make checks payable to "FAO USAED, New York" Liquidated damages $930.00 per calendar day of delay until all work under this contract is accepted. Parties requesting plans and specifications must do so in writing stating the solicitation number, project name, complete company name and street address (no post office boxes) telephone and fax number. Contact Contract Specialist Ina J. Ohrwashel, phone 212-264-0154; New York District, COE, Attn: CENAN-CT, 26 Federal Plaza, Rm 1843, New York, N.Y. 10278-0090.



DACW51-00-B-0002. Bid opening on or about June 5, 2000; issue date on or about May 5. MAINTENANCE DREDGING, LAKE MONTAUK HARBOR, NEW YORK. This project is being postponed until the above dates due to problems with the upland disposal site. Contact: Ina J. Ohrwashel, contract specialist, phone 212-264-0154; New York District, COE, Attn: CENAN-CT, 26 Federal Plaza, Room 1843, New York, N.Y. 10278-0090.



DACW51-00-B-0002. This contract postponed for several months. MAINTENANCE DREDGING GLEN COVE CREEK, LONG ISLAND. (DACW51-99-B-0030) Removal and satisfactory disposal of approximately 50,000 cy of channel sediment except ledge rock lying above the plane of eight feet below mean low water with two feet allowable overdepth. Dredged material will be placed on an approved upland site adjacent to the creek. Cost estimate, $500,000 to $1 million. Small business setaside. Completion date 90 days after issuance of Notice to Proceed. Plans and specifications will be available on or about January 28, 2000 at the non-refundable cost of $30. Mail requests to New York District, US Army Corps of Engineers, 26 Federal Plaza, Contracting Division, Room 1843, New York, New York 10278-0090. Make checks payable to "FAO, USAED, New York" Parties requesting plans and specifications must do so in writing stating the solicitation number, project name, complete company name and street address (we will not deliver to PO Boxes) telephone and fax number. Liquidated damages is $960 per calendar day of delay until all work under this contract is accepted. Plans and specifications may be examined at the New York District office and at the following offices: FW Dodge Company, 1221 Avenue of the Americas, New York City; Brown's Letters, 163 Stuyvesant Avenue, Lynhurst, New Jersey. Contact Ina J. Ohrwashel, contract specialist, phone 212-264-0154; New York District, COE, 26 Federal Plaza, Rm 1843, New York, N.Y. 10278-0090.



DACW51-00-B-0005. Bid opening CHANGED TO April 4, 2000, 10 a.m. CONEY ISLAND BEACH NOURISHMENT, SEA GATE, CONEY ISLAND. The U.S. Army Corps of Engineers intends to procure beach replenishment at Coney Island, New York. The project consists of the construction of a stone revetment adjacent to the West 37th Street Groin in the Sea Gate community at Coney Island, New York. The revetment will be constructed of several sizes of stone and involve the possible placement of a geo-textile. The Corps of Engineers criteria for stone placement and geo-textile placement will be followed. The project also consists of dredging of sand immediately offshore of the Gravesend Bay side of the Sea Gate Community and the placement of the sand along the Atlantic shore of the Sea Gate Community adjacent to the west side of the West 37th Street groin. This dredging and placement of sand will occur concurrently. Debris on the Gravesend Bay side of the Sea Gate community will also be removed and disposal will be off site. Cost estimate: $1 million to $5 million. Plans and specifications available December 17, 1999. The estimated time for project completion will be 180 days. The nonrefundable charge for plans and specifications is $35.00 per set. This solicitation is set aside for small businesses, but could be converted to full and open competition if an insufficient number of small businesses respond. Plans and specifications can be viewed at room 1843 at 26 Federal Plaza, New York, NY 10278; at Browns Letters at 1167 McBride Avenue, West Paterson, NJ, and at F.W. Dodge at Two Penn Plaza, 10th Floor, New York, NY 10121. Contact Anthony P. DeStefano, Contract Specialist, phone: 212-264-6706, fax 212-264-3013. US Army Corps of Engineers, New York District, Attn: CENAN-CT, 26 Federal Plaza, Room 1843, New York, N.Y. 10278-0090.



PENNSYLVANIA



DACW59-00-B-0012. Bid opening April 20, 2000. BRADDOCK LOCKS AND DAM, NAVIGATION CHANNEL, PHASE ONE, POOL 3 DREDGING. Dredging various stretches of the Monongahela River in Washington County and Westmoreland County, Pennsylvania, between River Mile 23 and River Mile 42. The work includes the removing approximately 195,000 cubic yards of material from the river, disposal of portions of the dredged material at a permitted landfill, and in-river placement of the remainder of the material. Period of performance: 150 calendar days. Cost estimate, $5 million to $10 million. Unrestricted. Plans and specifications will be on Compact Disk (CD-ROM) only, provided free of charge, and available on or about March 20, 2000. Requests must be in writing or faxed to 412-644-5109. Contact: Michele R. Hutfles, contract specialist, 412-395-7479; Pittsburgh District, COE, William S. Moorhead Federal Building, 1000 Liberty Avenue, Room 727, Pittsburgh, PA 15222-4186.



DACW59-00-B-0016. Bid opening May 11, 2000. STILLING BASIN EXTENSION AND DOWNSTREAM SCOUR PROTECTION, CHARLEROI LOCKS AND DAM, MONONGAHELA RIVER. The work involves extending the existing stilling basin at Monongahela River Mile 41.5 and placing new scour protection downstream of the new extension and along the existing left abutment wall. Major features of the work include performing underwater excavation (dredging), furnishing and installing a steel sheet pile cut-off wall, furnishing and installing soil anchors in the existing left abutment wall, placement of tremie concrete to form the extended stilling basin slab, furnishing and placing granular backfill and filter materials, and furnishing and placing graded rip rap scour protection, and transport and disposal of excavated material in the Allegheny River, approximate river mile 25. Specialty services include diving and operations conducted from floating plant. The period of performance will be 540 calendar days. Cost estimate $5 million go $10 million. Unrestricted. The plans and specifications will be placed on Compact Disk (CD-ROM) and will be provided free of charge. Plans and specifications will not be provided in a printed paper hard copy format. Issue date app. April 11, 2000. Requests must be made in writing or faxed to 412-644-5109. Contact: Michele R. Hutfles, contract specialist, 412-395-7479, Pittsburgh District, COE, William S. Moorhead Federal Building, 1000 Liberty Avenue, Room 727, Pittsburgh, PA 15222-4186.



URL: http://www.gpo.gov/procurement/index.html



SOUTH ATLANTIC



ALABAMA



DACW01-00-R-0030. Bid opening April 27, 2000. Furnish rental equipment, operators, supplies, materials, labor, transportation and fuel to perform maintenance and rehabilitation of approximately 18 dredged material disposal sites, and levee maintenance along 14 miles of levee. The work for disposal area sites will consist of raising dikes, construction of new areas, grading material, installing weirs, and ditching. Levee maintenance work will include mowing, fertilizing, ditching, vegetation control, excavation, grading and filling to maintain levee crown. Dredging will include removing shoaled material and placement on adjacent beach. Indefinite Delivery Indefinite Quantity Contract consisting of a Base Year, with four additional option years (which may or may not be exercised) at approximately $3,600,000 each year, and an estimated total value of approximately $18 million. This porcurement is a competitive 8(a) setaside. Individual Task Orders will be issued in accordance with the contract clause. A pre-proposal conference will be conducted at the Panama City Site Office, 1706 East 5th Street, Panama City, FL 32401 on April 11, 2000, 10:00 a.m. All interested offerors are urged to attend. During this conference, the requirements set forth in the solicitation will be reviewed d discussed, with part of the conference to include a question and answer period. Tour of the site will follow the conference. The duration of the conference and tour will be approximately one day. It is requested that a representative of each offeror attend the pre-proposal conference. Number of attendees is limited to two from each firm. Name of individuals from each company who will attend the conference should be faxed to the following no later than five working days prior to the conference. Fax information to: Larry Mathis, Panama City Site Office, fax: 850-785-5599. The plans and specifications will be issued free of charge on Compact Disc (CD-ROM) only. All bid forms, bid bonds, and other normal documents required for the bid submittal, including amendments to the bid submittal, will be in paper medium. Electronic medium for the bid submittal documents will not be allowed. Contact: Donald Green, 334-694-3730; fax: 334-694-4264. Plans room: 334-690-2535. Mobile District, COE, Contracting Division, CESAM-CT PO Box 2288, Mobile, AL 36628-0001.



DACW01-00-B-0008. Bid opening date not established. RENTAL OF HOPPER DREDGE & ATTENDANT PLANT FOR DREDGING OF MOBILE HARBOR CHANNELS, MOBILE, ALABAMA - #3-00. Maintenance dredging in navigation channels along the Gulf Coast of Mississippi, Alabama, and Northwest Florida. The primary work location is intended to be Mobile Harbor. However, work at Pascagoula Harbor, Gulfport Harbor, Pensacola Harbor and Panama City Harbor is also possible. Rental of dredge: consists of removal and disposal of all material lying above the plane of 52 feet MLLW, or as directed by the Contracting Officer's Representative (COR), over the bottom widths (full and/or partial) and applicable side slopes, at specific work locations within the specified dredging limits of this contract. The COR will furnish the specific locations in advance. Rental dredge plant: consists of furnishing and operating a hopper dredge with pump discharge of not less than 24-inch diameter nor more that 33.5-inch diameter complete with all necessary materials, supplies, labor, and transportation including fuel, power, and water for excavation operations as specified. General excavation limits include the entire Mobile Harbor Project; however, specific locations will be as directed by the government within the total contract limits. All work will occur only as directed by the COR. There is no guarantee as to the amount of work. Cost estimate: $1 million to $5 million. Unrestricted. Requests for plans and specifications will indicate in writing whether firm will bid as a prime contractor or a subcontractor. For questions on the project, contact Anthony Goretski, phone 334-694-3868. For questions on distribution of plans and specifications, contact Plans Room, phone 334-690-2535/2536, fax 334-694-4343. Mobile District, COE, CESAM-CT (109 St. Joseph Street 36602) PO Box 2288, Mobile, AL 36628-0001.



DACW01-00-B-0009. Bid opening date not established. RENTAL OF HOPPER DREDGE & ATTENDANT PLANT FOR DREDGING OF MOBILE HARBOR, CHANNELS, MOBILE, ALABAMA - #4-00. Maintenance dredging in navigation channels along the Gulf Coast of Mississippi, Alabama, and Northwest Florida. The primary work location is intended to be Mobile Harbor. However, work at Pascagoula Harbor, Gulfport Harbor, Pensacola Harbor and Panama City Harbor are also possible. Rental of dredge: consists of removal and disposal of all material lying above the plane of 52 feet MLLW, or as directed by the Contracting Officer's Representative (COR,) over the bottom widths (full and/or partial) and applicable side slopes, at specific work locations within the specified dredging limits of this contract. The COR will furnish the specific locations in advance. Rental dredge plant: consists of furnishing and operating a hopper dredge with pump discharge of not less than 24-inch diameter nor more that 33.5-inch diameter complete with all necessary materials, supplies, labor, and transportation including fuel, power, and water for excavation operations as specified. General excavation limits include the entire Mobile Harbor Project. However, specific locations will be as directed by the government within the total contract limits. All work will occur only as directed by the COR. There is no guarantee as to the amount of work. Cost estimate: $1 million to $5 million. Unrestricted. Requests for plans and specifications should indicate in writing whether firm will bid as a prime contractor or a subcontractor. View the District's Internet site: http://www.sam.usace.army.mil/sam/ct for amendments. Contact Allen Harrison, phone 334- 694-3624, fax: 334-690-2902 for questions on the contract; and Plans Room, phone: phone: 334-690-2535/2536, fax: 334-694-4343 for questions on distribution of plans and specifications. Mobile District, COE, CESAM-CT (109 St. Joseph Street 36602) PO Box 2288, Mobile, AL 36628-0001.



DACW01-00-B-0023 Bid opening Feb. 24, 2000. RENTAL OF HYDRAULIC CUTTERHEAD PIPELINE DREDGE & ATTENDANT PLANT W/OPERATORS FOR MAINTENANCE DREDGING ON THE ALABAMA RIVER AND BLACK WARRIOR & TOMBIGBEE RIVER SYSTEMS. PRINCIPAL ASSIGNMENT IS EXPECTED TO BE THE ALABAMA RIVER SYSTEM. Maintenance dredging: removal of shoals to restore the authorized navigation channels width and depth on the Lower Tombigbee River from miles 45 to 213 at Demopolis Lock, or the Black Warrior-Tombigbee Waterway (BW& T) from Demopolis Lock to mile 338 at Oliver Lock and Dam, or on the Alabama River from miles 0.0 to 236.2 at Robert F. Henry Lock and Dam, or on the Tenn-Tom Waterway from the junction with the Black Warrior River at mile 217 to Mississippi Highway 325 Bridge at mile 443.4. The intended principal work site is the Alabama River System; however, the contractor may be required to work on any of the other navigation systems listed above. Dredge Plant: furnish a hydraulic cutterhead pipeline dredge with pump discharge of 20 inches (with brake horsepower of not less than 2100), 22-inch diameter (with brake horsepower of not less than 2400), or 24-inch diameter (with brake horsepower of not less than 2400.) The dredge will be complete with all necessary materials, supplies, (including fuel, power, and water) labor, and transportation for maintenance dredging operations as specified above. Bid documents will be available on or about January 3, 2000. Cost estimate: $1 million to $5 million. Unrestricted. Documents will be available on January 7, 2000. All responsible sources may submit a bid, which will be considered. Contact Karen Johnson, 334-690-2535, Mobile District, COE, Contracting Division, CESAM-CT (109 St. Joseph Street 36602) PO Box 2288, Mobile, AL 36628-0001.



CONTRACT AWARD, ALABAMA



DACW01-00-C-0010 / DACW01-00-R-0033. EMERGENCY CONTRACT FOR PROTECTIVE BEACH BERM, DAUPHIN ISLAND. Awarded to Gulf Sand & Gravel Inc, DBA ENCO Dredging for $714,339, lines 1 – 2c on March 24. Mobile District, COE.



FLORIDA



Website for Jacksonville district: http://www.saj.usace.army.mil/



N62467-99-R-1032. Bid opening January 6, 2000, 4 p.m. HARBOR OPS/SMALL CRAFT BERTH, NAVAL STATION, MAYPORT, FLORIDA. This is a two-phase design-build contract, to be accomplished by a contractor/A-E team. Phase I proposals were received on Jan. 6, 2000. The Navy is evaluating the proposals and will short list three to five teams by approximately the end of January. These teams will receive solicitations, and bids will be due 30 days later. After evaluation of these bids, an award will be made. Contact Barbara Green, Code 0211BG, fax: 843-820-5853, Southern Division, Naval Facilities Engineering Command, 2155 Eagle Drive, P. O. Box 190010, North Charleston, SC 29419-9010.



DACW17-00-B-0001. Not issued. Opening date to be announced. MAINTENANCE DREDGING, 46-FOOT PROJECT, KINGS BAY, GEORGIA AND FERNANDINA HARBOR, FLORIDA. The project work consists of removing shoals along the Entrance Channel Cut-1N from Station 100+00 to Station 220+00. The Entrance Channel will be dredged to a required depth of 49 feet plus two-foot allowable overdepth. Total quantity, approximately 300,000 cubic yards. All dredged material will be placed in the designated north beach disposal area, D/A-B, located approximately four miles from the project site. Hopper dredges will not be allowed for this contract, as construction will be performed during the summer months. In addition to the standard dredging equipment, front-end loader and dozers will be required to perform subject work. Cost estimate: $5 million to $10 million. Unrestricted. Solicitation will be issued in electronic format only. Bidders will be provided a CD-ROM at no cost. Include telephone, fax number, and tax identification number. Request for CD-ROM may be made to: reena.mobley@usace.army.mil. Respond by fax to: Attn: Kenneth Faulk at 904 232-2748. Physical address: 400 West Bay Street, Room 867, Jacksonville, FL 32202. Contact Reena Mobley, 904-232-3702. U.S. Army Corps of Engineers, Jacksonville District, P.O. Box 4970, Jacksonville, Florida 32232-0019.



DACW17-99-B-0040. KISSIMMEE RIVER PROJECT, CONTRACT 2B: CANAL ENLARGEMENTS AND LOCAL LEVEE MODIFICATION, OSCEOLA AND POLK COUNTIES. Apparent low bidder, Hendry Corp., $5,385,300; 2nd. Herve Cody, $6,927,800; 3rd. Jesco Construction, $7,348,483; gov. estimate, $12,061,125. Dredging and disposing of 900,000 cubic yards of unclassified material from Canal C-37 and 130,000 cubic yards of unclassified material from Canal C-36. Disposal is along each Canal except for 300,000 cubic yards from Canal C-37 which must be hauled to a disposal area 10 miles away. Levee modifications consist of degrading approximately 2,000 linear feet of levee and disposing approximately 30,000 cubic yards of degraded soil adjacent to the work area. Clearing and grubbing and road maintenance are also contract requirements. Equipment needed would include, but is not limited to, dredges, draglines, bulldozers, backhoes, dump trucks, and heavy construction equipment for earthwork. Cost estimate: $5 million to $10 million. Small business set aside. Contact Bob Mosteller, phone 904-232-3739; Jacksonville District, COE, PO Box 4970, Jacksonville, FL 32232-0019.



DACW17-00-B-0012. Bid opening April 4, 2000. MAINTENANCE DREDGING, 41-FOOT PROJECT, ENTRANCE CHANNEL, TRIDENT ACCESS CHANNEL, AND TRIDENT TURNING BASIN, CANAVERAL HARBOR. Removal of shoal material from Entrance Channel Cuts 1B, 1, and 2 (including wideners between Cut-1 and Cut-2) and from the Trident Channel and the Trident Turning Basin. The dredging work will consist of removal of approximately 159,000 cubic yards of shoal material from the outer portion of the project with disposal in Ocean Disposal Area-O as well as removal of approximately 102,000 cubic yards of shoal material from the inner portion of the project with disposal in the Nearshore Disposal Area or the Ocean Disposal Area-O. The determination of which disposal area to use will be based on a visual inspection of the dredged material. Work also includes turbidity monitoring. Only Coast Guard certified vessels will be allowed to work in this project. Construction time is 90 calendar days. Cost estimate, $1 million to $5 million. Unrestricted. Invitation will be issued on or about February 15, 2000. Solicitation will be issued in electronic format only. Bidders will be provided a CD-ROM at no cost. Interested offerors must register electronically. The registration form is located at http://www.saj.usace.army.mil/. Contact: Contract Specialist, Griselle Gonzalez, 904-232-3972, Jacksonville District, COE, P.O. Box 4970, Jacksonville, Florida 32232-0019.



DACW17-00-B-0011. Bid opening April 18, 2000. MAINTENANCE DREDGING, 7-FOOT PROJECT, ST LUCIE INLET, MARTIN COUNTY. Removal of about 239,000 cubic yards of unclassified sediment from the navigational channel, transition area and impoundment basin. The material will be disposed in the near shore disposal area some eight miles south of the inlet. Material will be disposed landward of the -16-foot contour. Dredging is both landward and seaward of the COLREGS Demarcation Line. The nearshore disposal area is seaward of the COLREGS Demarcation Line. Only Coast Guard Certified vessels will be allowed to work in this project. Construction time is 120 calendar days. Cost estimate, $1 million to $5 million. Unrestricted. Invitation will be issued on or about March 1, 2000. Solicitation will be issued in electronic format only. Bidders will be provided a CD-ROM at no cost. Contact: Contract Specialist, Griselle Gonzalez, phone: 904-232-3972; Jacksonville District, COE, P.O. Box 4970, Jacksonville, Florida 32232-0019.



DACW17-00-B-0020. Bid opening app. May 2, 2000. MAINTENANCE DREDGING, INNER CHANNEL, FERNANDINA HARBOR 36-FT. PROJECT & TURNING BASIN, 35-FT. PROJECT, FERNANDINA HARBOR. Remove approximately 150,000 cy from the Inner Channel and Turning Basin. The quantity of material represents dredging the channel and turning basin to the appropriate project depth for each area plus an allowable one foot overdepth. Material will be placed in either the nearshore disposal area or the Ocean Dredged Material Disposal Site (ODMDS) , depending on the quality of the material. Material identified with less than 20 percent fines will be placed into the ODMDS. The material is expected to contain both nearshore quality and non-beach quality. Equipment needed would include but not limited to, clamshell dredge, bottom dump scows, tugs, and attendant plant. Performance period: 75 calendar days. Cost estimate: $1 million to $5 million. Unrestricted. Issue date on or about March 16, 2000. Solicitation will be issued in electronic format only, at no cost. Contact Bob Mosteller, email: Robert.W.Mosteller@usace.army.mil; Jacksonville District, COE, P.O. Box 4970, Jacksonville, Florida 32232-0019.



F08651-00-Q0238. Bid opening approximately May 15, 2000. DREDGE BEN'S LAKE PASS. Dredge Ben's Lake Channel, Eglin AFB, FL, Okaloosa County, Florida. Project includes furnishing all plant; labor, equipment and materials to dredge and provide construction and maintenance of dredged material containment. Work consists of removing existing, accomplishment of environmental controls and the disposal of dredged materials materials complete. The lump sum contract price will include the cost of performing the work as shown on the drawing and as specified hereafter. Cost estimate $25,000 to $100,000. Performance period is 30 calendar days. All responsible sources may submit a quote, which will be considered by the Agency. Firms responding should indicate if they are a small business. The above general description of work does not in any way limit the responsibility of the contractor to perform all work and furnish all plant, labor, equipment, and materials complete in accordance with the plans and specifications. Firms responding should indicate if they are interested in this project as a prime or subcontractor. Reply either by fax to 850-882-9441, attention Lana Wallace, or email wallace@eglin.af.mil. This is a paperless acquisition. Paper copies of the solicitation will not be issued, but the Request for Quote (RFQ) will be available on the Federal Government's Electronic Posting system, www.eps.gov. Contact Lillie Loggins, contract specialist, phone 850-882-5628 ext. 5274, email: kingman@eglin.af.mil. Website:



http://www.eps.gov/cgi-bin/WebObjects/EPS?ACode=P&ProjID=F08651-00-Q0238&LocID=1182



DACW17-00-B-0025. Bid opening May 17, 2000. MAINTENANCE DREDGING, 12-FOOT PROJECT, INTRACOASTAL WATERWAY, JACKSONVILLE TO MIAMI, FLORIDA, VICINITY OF HAULOVER CANAL, BREVARD COUNTY, FLORIDA. Remove shoals along the Intracoastal Waterway (IWW) in the vicinity of Haulover Canal. A depth of 12 feet MLW will be required with an allowable overdepth of two feet. The base bid will require maintenance dredging of Cut BV-1 Station 0+00 to Cut BV-7 Station 0+00 and will total approximately 1.4 million cubic yards of material to be removed. Option Bid Item A (if awarded) will require maintenance dredging of Cut BV-7 Station 0+00 to Cut BV-9 Station 43+00 and will total approximately 0.4 million cubic yards of material to be removed. All dredged material will be placed in upland disposal area BV-2C located approximately 4.5 miles north of the intersection of Cut BV-5 and Cut BV-6. Cost estimate: more than $10 million. Solicitation will be issued on or about 17 April 17, 2000. Solicitation will be issued in electronic format only. Bidders will be provided a CD-ROM at no cost. Contact: Reena Mobley, 904- 232-3702; Jacksonville District, COE, P.O. Box 4970, Jacksonville, Florida 32232-0019.



Email: reena.mobley@usace.army.mil;



Website: http://www.usace.army.mil



DACW17-00-B-0027. Bid opening June 1, 2000. TAMPA HARBOR CONSTRUCTION DREDGING, 34-FOOT PROJECT, YBOR TURNING BASIN WIDENER. Widen the existing Ybor Turning Basin by approximately 200 feet and incorporate a channel transition wedge into the Sparkman Channel. The new widener will be dredged to a project depth of 34 feet plus two additional feet of required dredging plus one foot of allowable overdepth. Total amount of material to be dredged is approximately 468,000 cubic yards. Dredged material will be placed in two separate areas: a) approximately 318,000 cy within an upland disposal facility to be constructed under this contract at Hooker's Point located approximately 2.5 miles from the dredging area; and b) approximately 150,000 cy will be placed in open water within the de-authorized Garrison Channel. The following restrictions regarding order of work will be specified for this contract: a) The first order of work under this contract will be the construction of the upland disposal facility at Hooker's Point using materials available on site; b) prior to any dredging, the relocation of oyster beds impacted by the widener must be accomplished; c) The first order of dredging work will be the construction of the underwater containment berms in the Garrison Channel; d) The second order of dredging work will be the placement of material in the Garrison Channel until it is filled to the lines and grades shown on the contract plans; and e) the final order of dredging work will be the dredging of all remaining material to the required depth with disposal in the newly constructed upland disposal area. Note: Oyster bed relocation and subsequent dredging and disposal of material in the Garrison Channel may begin prior to completion of the upland disposal area construction; however, the upland disposal area must be complete and ready for use once the Garrison Channel has been filled. Construction time is 120 calendar days. Cost estimate, $1 million to $5 million. Unrestricted. Issue date, on or about April 24, 2000. Solicitation will be issued in electronic format only. Bidders will be provided a CD-ROM at no cost. Contact: Deidra W. Cox, phone 904-232-1215; Jacksonville District, COE, P.O. Box 4970, Jacksonville, Florida 32232-0019.



DTCG82-00-B-3WCA16. Bid opening app. August 15, 2000. DREDGE BOAT BASIN AT U.S. COAST GUARD STATION VENICE, LOUISIANA. Furnish all labor, tools, equipment and materials necessary for maintenance dredging of the boat basin to elevation 11 feet NGVD. The government estimate of dredged material to be removed is 12,000 cubic yards. Dredged material will be transported by hydraulic pipeline to an inland pond across the Tiger Pass waterway and distributed to develop wetlands for emergent flora. Cost estimate $100,000 to $250,000. Issue date, April 15, 2000. Plans will be



available for inspection at 15608 SW 117th Avenue, Miami, Florida, after they have been issued. Bid guarantee, payment and performance bonds are required. This solicitation is being issued pursuant to the Small Business Competitiveness Demonstration Program and is open to both small and large businesses participation. Fax request for a bid package to 305-278-6696. Contact: Judy Stamper, 305-278-6724, USCG Civil Engineering Unit Miami, 15608 SW 117th Ave., Miami, FL 33177-1630.



GEORGIA



DACW21-00-B-0007. Bid opening Feb. 18, 2000, 3 p.m. ADVANCE MAINTENANCE WIDENER CONSTRUCTION DREDGING, BRUNSWICK GEORGIA. New work dredging along the north bank of the Brunswick Harbor Entrance Channel between Stations -14+000 to -15+000 and -22+000 to -28+000. Dredging will consist of approximately 500,000 cubic yards of material with an option to dredge an additional 74,000 cy adjacent to the project. The project will construct an advance maintenance widener for the channel 100 feet wide to depth of -32 feet mlw, with a 1(V) on 5(H) side slope between the stations listed above. Materials expected to be encountered consist of predominantly sands, some silts and clays. All dredged material will be placed in nearshore disposal areas adjacent to the entrance channel. Cost estimate, $1 million to $2 million. Unrestricted. Network Analysis System will be required. Cost estimate: $1 million to $2 million. Solicitation to be issued in electronic format only, and will be available on the Internet at http://www.sas/usace.army.mil/ebs/. Amendments will be posted on the Internet at this address, also. Requests for solicitation packages must be made in writing no later than December 27, 1999. Requests may be faxed to 912-652-5828. Documents will be issued on a first come, first served basis, one set per firm. Contact Sandra B. Meyers, Savannah District, COE, 100 West Oglethorpe Avenue, Savannah, GA 31401-3640. Phone: 912-652-5324.



Email: sandra.b.meyers@sas02.usace.army.mil



MARYLAND



The Swedish dredging company Skanska's US subsidiary Tidewater Skanska has been awarded a contract to restore a large bird sanctuary on Poplar Island outside Baltimore. Skanska was recently acquired by Royal Boskalis Westminster. The $37.6 million contract includes restoring the Island to its approximate size in 1847, creating an area of about 1100 acres, half of which will be wetlands. A 12-km dike will be built around the current island, which consists of a small group of eroded islands. Later the group’s upland and wetland habitats will be restored using dredged material from the Port of Baltimore. About 29 million cubic meters of dredged material will be used to reclaim land inside the dike. Smaller dams and channels will be created to create a complex of habitats for birds, including bald eagles, osprey, heron and egret.



NORTH CAROLINA



DACW60-00-B-0002. Bid opening April 6, 2000. CALABASH CREEK NAVIGATION PROJECT, TOWN OF CALABASH, BRUNSWICK COUNTY. Construct low level dikes on Goat Island Disposal Site in Horry County using material at site. Construct adjustable water control structure on AIWW side of disposal site. Dredge 60-foot-wide navigation channel in Calabash Creek from the AIWW upstream for a distance of approximately 1.5 miles. Dredged material is to be placed in the Goat Island Disposal Site. Cost estimate: $250,000 to $500,000. Plans and specs available only in electronic format on compact disk at no cost. Submit requests via fax: 843-746-2760, or mail request to U.S. Army Corps of Engineers, P.O. Box 919, Charleston, SC 29402-0919, Attn: Contracting Division. Barbara Barnette, phone: 843-746-2752.



DACW54-00-B-0006. NEW bid opening May 9, 2000. Issue date April 5, 2000. WILMINGTON HARBOR, NC - 96 ACT, BALDHEAD SHOAL CHANNEL DREDGING, STA. 120+00 - 355+00. Construct a new channel east of the existing Wilmington Harbor Ocean Bar Channel alignment. The work will require removal and disposal of material to provide a channel depth of -44 feet mean lower low water (MLLW) plus two feet of allowable overdepth over a distance of 23,500 feet. Material deposited from previous Wilmington Harbor dredging and disposal operations will be encountered where the new channel passes through the Wilmington Ocean Dredged Material Disposal Site (ODMDS). Disposal of all dredged material will be in another area within the ODMDS. The total quantity, including allowable overdepth, is estimated to be about seven million cubic yards. Cost estimate, more than $10 million. Unrestricted. Note: Plans and specs for this project will be issued on CD-ROM at no charge. Money will be returned to contractors who have already paid for the documents. Contact: Danny Kissam, phone 910-251-4424; Wilmington District, Corps of Engineers, P.O. Box 1890,



Wilmington, NC 28402-1890.



DACW54-00-B-0007. Bid opening May 31, 2000. Issue date April 19, 2000. WILMINGTON HARBOR, NC-96 ACT, STATION 60+00 LOWER BRUNSWICK CHANNEL TO STATION 55+00 KEG ISLAND CHANNEL DREDGING. Contact Danny Kissam, contract specialist, phone 910-251-4424, Wilmington District, COE, P.O. Box 1890, Wilmington, NC 28402-1890.



PUERTO RICO



DACW17-99-B-0030. Bid opening postponed indefinitely. EMERGENCY MAINTENANCE DREDGING, 25-FOOT PROJECT, ARECIBO HARBOR, PUERTO RICO. Awarded to Great Lakes Dredge & Dock Company for $1,906,325. Maintenance dredging of approximately 150,000 cy of material from reaches 1 and 2 to a required depth of 25 feet, with a two-foot allowable overdepth. Material will be placed on a beach disposal area approximately 6500 feet west of Arecibo Harbor. Work also includes turbidity monitoring. Contractor will begin performance within 30 calendar days and complete it within 55 calendar days after receipt of Notice to Proceed. Unrestricted. Contact Contract Specialist, Vicki V. Tipton, 904-232-1146; email: Vicki.V.Tipton@usace.army.mil; Jacksonville District, COE, PO Box 4970, Jacksonville, FL 32232-0019.



SOUTH CAROLINA



The Charleston District, U.S. Army Corps of Engineers has moved to 4600 Goer Drive, North Charleston, SC 29406. All phone numbers have changed.



VIRGINIA



Due March 7, 2000. SOURCES SOUGHT FOR PROJECT ENTITLED OFFSHORE BREAKWATERS, FORT STORY, VIRGINIA. Approximately 30 responses were received from reliable small businesses with the equipment and availability to perform this job. Therefore, Jack Beecher, deputy for small business for the Norfolk District, Corps of Engineers, is recommending that this project be advertised as a 100 percent small business setaside. Advertising date is in the early summer. The project consists of constructing a stone breakwater system to protect approximately 5,500 linear feet of shoreline at Fort Story. The eight stone breakwaters are conceptually designed with a 250-foot length and a gap spacing of 350 feet using a four-ton uniform stone. The work will involve some sand replenishment, which will call for dredging or trucking or both. Cost estimate: $5 million to $7 million. Solicitation date July 2000. Contact: Jack Beecher, Norfolk District Corps of Engineers, 803 Front Street, Norfolk, VA 23510-1096. Email: jack.beecher@usace.army.mil



DACW65-00-B-0003. Bid opening April 11, 2000. MAINTENANCE DREDGING, TANGIER CHANNELS AND BASIN, ACCOMACK COUNTY. Maintenance dredging of the channel to Tangier Sound to a depth of nine feet MLLW, the channel to Chesapeake Bay to a depth of eight feet MLLW, and the basin to a depth of 8 feet MLLW, each with one foot of allowable overdepth. The work, including allowable overdepth and estimated accretion to May 1, 2000, involves dredging approximately 65,000 cubic yards of material to be transported and deposited in the government-furnished shoreline placement site by hydraulic pipeline. Cost estimate: $50,000 to $500,000. Duration of construction is 50 calendar days. 100 percent small business set aside. Solicitation will be available on CD-ROM only at no charge and is limited to 1 copy per firm. Contact: Sarah T. Pieczonka, phone 757-441-7551; email: sarah.t.pieczonka@usace.army.mil; Norfolk District, Corps of Engineers, Attn: CENAO-CT, 803 Front Street, Norfolk, Virginia 23510-1096.



501810B002, Specifications issued January 28; bid opening March 10, 2000. DREDGING CHANNEL, BACK BAY NATIONAL WILDLIFE REFUGE, VIRGINIA BEACH. The work includes all labor and equipment. Cost estimate under $100,000. Unrestricted. Issue date on or about October 29, 1999. Plans and specs are available without charge and can be requested in writing to the address below, Attention Gary M. Dupuis, Contracting Officer. Fax requests will be accepted at 413-253-8450. Any requests for a solicitation package must include the company name, address, telephone and fax numbers, point of contact. Reference the solicitation number and title. Contact: Gary Dupuis, contracting officer, phone: 413-253-8240; U.S. Fish and Wildlife Service, Contracting and General Services, 300 Westgate Center Drive, Hadley, MA 01035-9589.



DACW65-00-B-0004. Bid opening June 6, 2000. MAINTENANCE DREDGING AT VARIOUS LOCATIONS, JAMES RIVER. Maintenance dredging and disposal of dredged material by hydraulic dredge and pipeline at various locations on the James River. The contract will be awarded as an Indefinite Quantity Contract; task orders will be issued for various locations on the James River. The initial contract ordering period will be one year, with options for four additional periods. Total awards during each ordering period are not expected to exceed $1 million. Construction time for each task order, as well as the specific work requirements for the respective dredging and material placement operations, will be indicated in the individual task orders. The contractor will provide all necessary plant and equipment capable of dredging to depths of 27 feet below mean low water, and pumping dredged material at distances as far as 13,500 feet. The contractor will be required to use and maintain government-furnished placement sites for all dredged material on this contract. A pre-bid conference will be held on May 3, 2000 in the 3rd Floor Conference Room at the Norfolk District, Corps of Engineers, 803 Front Street, Norfolk, VA 23510-1096. The purpose of this conference is to answer questions from potential bidders concerning the solicitation and contract requirements. Questions may be submitted in writing to the contracting office representative POC prior to the conference. The solicitation will be provided in an electronic format, (compact disk and/or Internet) free of charge to all registered plan holders. Notification of amendments may be made by fax, floppy disk, compact disk and/or postings to the Internet. Bidders will be responsible for monitoring the Internet for amendments. Interested firms may view and/or download the solicitation on or after April 5, 2000 from the District website:



http://www.nao.usace.army.mil/Ebs/Asp/AdvertisedSolicitations.asp. Request the solicitation compact disk by registering at this site as a planholder. Contact: Charlotte Hofstetter, phone 757-441-7136, Norfolk District, COE, Attn: CENAO-CT, 803 Front Street, Norfolk, VA 23510-1096.



NORTH CENTRAL



ILLINOIS



DACW27-00-B-0017. Bid opening April 25, 2000. MAINTENANCE DREDGING, WAUKEGAN HARBOR. Maintenance and advance maintenance dredging of approximately 50,000 cubic yards of material from the outer harbor, Waukegan Harbor, Illinois. Cost estimate, $250,000 to $500,000. 100 percent small business setaside. Plans and specs available on CD-ROM or by download from the Internet. Contact Contract Specialist Tom Dickert, phone 502-625-7531; or technical contact Felicia Kirksey, phone 312-353-6400, ext. 3028; Louisville District, COE, 600 M.L. King, Jr. Pl., Room 821, Louisville, KY 40202-2230.



Website: http://www.lrl.usace.army.mil.



MICHIGAN



DACW35-00-B-0006. Bid opening March 7, 2000. MAINTENANCE DREDGING AT ONTONAGON HARBOR. (Amendment, Dec. 23, 1999: this solicitation is for the base year of 56,000 cubic yards to be dredged and two option years of approximately 56,000 cubic yards per year. There are no further changes to this notice.) Remove approximately 56,000 cy. Cost estimate $250,000 to $500,000. 100 percent emerging small business setaside. The solicitation will be issued on a CD at no charge. There is no charge for the CD. Contractors may request a copy of the CD via fax at 313-226-2209, email address: Marilyn.R.Hill@lre02.usace.army.mil or mail to the address below. Include contractor's federal tax identification number. Telephone requests will not be honored. Contact Marilyn Hill, 313-226-6431; Detroit District, COE, 477 Michigan Ave, Detroit, MI 48226.



N68950-00-R-0200. Due February 28, 2000. ENVIRONMENTAL JOB ORDER CONTRACT, GREAT LAKES, ILLINOIS. Proposals have been received, and the contract will be awarded in June. Contact Judy Honold, 847-688-2600, ext. 171, honoldja@pwcgl.navfac.navy.mil. CO ENGFLDACT MW, 201 Decatur Avenue, Great Lakes, IL 60088-5600.



DACW35-00-B-0002. Bid opening March 15, 2000, 2 p.m. FY00 MAINTENANCE DREDGING AT BIG BAY AND WHITEFISH POINT HARBORS, MICHIGAN. The project consists of dredging approximately 15,000 cubic yards of material at Big Bay Harbor with placement on the beach located east of the harbor and dredging approximately 10,000 cubic yards of material at Whitefish Point Harbor with placement on the beach located south of the harbor. The Standard Industrial Code is 1629. 100 percent small business set aside. Cost estimate between $100,000 and $200,000. The solicitation will be issued on CD. There is no charge for the CD. Requests for the solicitation may be mailed or faxed to 313-226-2209. Include tax identification number with requests. Telephone requests will not be honored. Contact Sammie Hart, Jr. (313) 226-6358. U.S. Army Engineer District, Detroit, 477 Michigan Ave, Detroit, MI 48226.



DACW35-00-B-0011. Bid opening March 29, 2000. FY00 MAINTENANCE DREDGING HOLLAND HARBOR (INNER). Dredge approximately 51,000 cubic yards of material with disposal at a government-furnished dredged material placement area. 100 percent small business set-aside. Cost estimate: $250,000 to $500,000. The solicitation will be issued on CD at no charge. Mail or fax requests to: 313-226-2209. Telephone requests will not be honored. Contact: Sammie Hart, Jr., phone: 313-226-6358; Detroit District, COE, 477 Michigan Ave, Detroit, MI 48226.



DACW35-00-B-0015. Bid opening April 21, 2000. FY00 MAINTENANCE DREDGING AT MENOMINEE HARBOR. Work consists of, but is not limited to, furnishing all plant, labor, and material and equipment necessary to remove and dispose of approximately 17,000 cubic yards of dredged material. Cost estimate, $100,000 to $250,000. 100 percent small business setaside. Estimated completion peiod is 30 days after receipt of Notice to Proceed. Contact: Bill Bruss, phone 313-226-3648; Detroit District, COE, 477 Michigan Ave, Detroit, MI 48226.



DTCG83-00-Q-3WF173. Due app. April 22, 2000. DREDGE BASIN/ENTRANCE CHANNEL AT USCG STATION ST. CLAIR SHORES, ST. CLAIR SHORES. Provide all labor, material, equipment, transportation and supervision required to remove approximately 700 cy of rock/stone and relocate to banks adjacent the entrance road as shown on drawings. All rock/stone shall be rinsed of existing vegetation prior to placement. Any miscellaneous concrete removed from channel containing steel rebar shall be disposed of as construction debris in a certified landfill. Remove approximately 1670 cy of mixed clay, sand, silt, and gravel within area shown on drawings and dispose of material at the USACE Dickinson Island Confined Disposal Facility according to all local, state and federal regulations. Take before and after dredging soundings and compute the dredge quantity. Unit Work Items: Remove up to 1000 cy of mixed clay, sand, silt, and gravel within area shown on drawings and dispose of material at the USACE Dickinson Island Confined Disposal Facility according to all local, state and federal regulations. Cost estimate, $25,000 to $100,000. Unrestricted. Performance period: 60 days after receipt of Notice to Proceed. All relevant solicitation documents, including specifications and drawings will be available for download exclusively from the Internet on approximately March 25, 2000. Access the U.S. Coast Guard Civil Engineering Unit Cleveland website at: http://www.uscg.mil/mlclant/ceucleveland or GSA's Electronic Posting System (EPS) website at: http://www.eps.gov. Any amendments issued to this solicitation will be posted solely on these websites. Contact: Brian Jarrell, contract specialist, Phone 216-902-6220, fax 216-902-6277, email BJarrell@ceucleveland.uscg.mil. United States Coast Guard Civil Engineering Unit Cleveland, 1240 East 9th Street, Cleveland, OH, 44199-2060.



DACW35-00-B-0017. Bid opening May 31, 2000. BIG SUAMICO MAINTENANCE DREDGING. Remove approximately 35,000 cy within critical shoaling areas and all related work. Cost estimate, $100,000 to $500,000. 100 percent Hubzone setaside. No charge for solicitation documents. Contact: Deborah Butler, phone 313-226-6474; Detroit District, COE, 477 Michigan Ave, Detroit, MI 48226.



DACW35-00-B-0008. Not yet issued. Bid opening to be announced. SAGINAW RIVER MAINTENANCE DREDGING. Dredge approximately 138,000 cubic yards of material and all related work. 100 percent small business setaside. Cost estimate: $500,000 to $1 million. Solicitation documents will be issued in Electronic Bid Set (EBS) format on compact disc at no charge. Contact: Deborah McColla-Butler, phone 313-226-6474. Detroit District, COE, 477 Michigan Ave, Detroit, MI 48226.



DTCG83-00-B-3WF097. USCG STATION SAGINAW, MICHIGAN RENOVATE BUILDING FOR ATON PERSONNEL, UPGRADE BUSL VESSEL MOORINGS AND WIDEN DRIVEWAY. Provide all labor, materials, equipment, transportation and supervision required to, 1. renovate existing storage building to accommodate Station A to N personnel to include complete replacement of building wall and roof panels, construction of interior rooms, upgrading heating and electrical systems and complete in all related architectural work; 2. install electrical and water lines and connections necessary to service the 49-inch BUSL to include dredging of the basin and entrance channel to the BUSL moorings; and; 3. widen driveway to include all site preparation and construction work to remove existing pavement, prepare base course, and place new curbing and asphalt paving. Performance period is 150 days after Notice to Proceed with dredging to occur first. The SIC code is 1542. Cost estimate: $250,000 to $500,000. Unrestricted. When available, this solicitation can be downloaded from the GSA's Electronic Posting System at http://www.eps.gov, or accessed through the CEU Cleveland website at http://www.uscg.mil/mlclant/ceucleveland. Contact Audrey Overholt, Contract Specialist, 216-902-6217, fax 216-902-6277/78, Email aoverholt@ceucleveland.uscg.mil. Department of Transportation, United States Coast Guard (USCG), Commanding Officer, USCG Civil Engineering Unit Cleveland, 1240 East 9th Street, Cleveland, OH, 44199-2060.



CONTRACT AWARD, MICHIGAN



DTCG83-00-N-3WF173. DREDGE BASIN, ENTRANCE CHANNEL AT USCG STATION ST. CLAIR SHORES, ST. CLAIR SHORES. Awarded to Malcolm Marine, Inc. for $79,987.50, line 0001 on April 10, 2000. Contact: Brian Jarrell, contract specialist, phone 216-902-6220, USCG Civil Engineering Unit Cleveland, 1240 East 9th Street, Cleveland, OH, 44199-2060.



OHIO



DACW49-00-B-0006. Bid opening March 10, 2000, 1 p.m.. MAINTENANCE DREDGING, HURON HARBOR, HURON, ERIE COUNTY. Work consists of, but is not limited to, furnishing all labor, plant, material and equipment necessary to remove and dispose of approximately 100,000 cy of dredged material, other than ledge rock. 100 percent small business set aside. Cost estimate: $500,000 to $1,000,000. Plans and specifications are available at Contracting Division, US Army Engineering District, Buffalo, Building No. 1, second floor, 1776 Niagara Street, Buffalo, NY 14207-3199. Contact Richard W. Reffner, 716-879-4250. U.S Army Buffalo District, 1776 Niagara Street, Buffalo, NY 14207-3199.



Bid opening April 4, 2000. MAINTENANCE DREDGING, MAUMEE BAY, TOLEDO, LUCAS COUNTY, OHIO, AND DETROIT RIVER, WAYNE COUNTY, MICHIGAN. Work consists of, but is not limited to, furnishing all labor, material and equipment necessary to remove and dispose of approximately 125,000 cubic yards of dredged material, from Maumee Bay, and 600,000 cubic yards of dredged material, from the Detroit River. Cost estimate $1 million to $5 million. 100 percent small business setaside. Period of performance for Maumee Bay is 35 calendar days, and for Detroit River, is 60 calendar days after Receipt of the Notice to Proceed. Plans and specifications will be available on CD-Rom only, on or about Feb. 14, 2000. There is no charge for the CD and contractors may request a copy of the CD via fax at 313-266-2209.



Contact: Bill Bruss, phone, 313-226-3648; Detroit District, COE, 477 Michigan Ave, Detroit, MI 48226.



DACW49-00-B-0008. Bid opening March 16, 2000. MAINTENANCE DREDGING, LORAIN HARBOR, LORAIN, ERIE COUNTY, OHIO. Furnish all plant, labor, material and equipment necessary to remove and dispose of approximately 150,000 cubic yards of dredged material, other than ledge rock. Cost estimate: $500,000 to $1 million. 100 percent small business setaside. Period of performance is 80 calendar days. This procurement will be available at no charge on CD-ROM only. All programs and software necessary to view documents are contained on each CD. Contact: Richard W. Reffner, phone: 716-879-4250; Buffalo District, COE, 1776 Niagara Street, Buffalo, NY 14207-3199.



DACW27-00-B-0013. Bid opening March 29, 2000. LEASE OF DREDGE, OHIO RIVER Apparent low bidder, Jesco Construction Corp, $16,626,447.85; 2nd., Luhr Borthers, Inc., $18,269,484.83; gov. estimate, $18,493,716. Furnish, transport, and operate one cutterhead pipeline hydraulic dredge for maintenance of the navigation channel of the Ohio River and its principle tributaries and upper Mississippi River. This is a contract for one base year and four option years. Cost estimate, $1 million go $5 million. Unrestricted. Approximate issue date: February 28, 2000. Plans and specs available for download from Internet only. Contact: Robert VanHoff, email: Robert.J.VanHoff@lrl02.usace.army.mil. Louisville District, COE, 600 M.L. King, Jr. Pl., Room 821, Louisville, KY 40202-2230.



DTCG83-00-Q-3WF002. Originally advertised as 99-Q-3WF002. Bids submitted under both numbers will be applied to this contract. 47-foot MLB MOORING IMPROVEMENTS. Provide all labor, materials, equipment, transportation and supervision required to: excavate 4000cy of existing earth fill from proposed disposal field and haul to a dry disposal field within 4 1/2 miles away to create area for new dredged material; dredge, by bucket from barge, approximately 2500cy of material within the boat basin at Coast Guard Station Chincoteague, Virginia. Dispose material in an approved upland disposal site, approximately 2 l/2 miles away. Remove 2x6 timber fenders along travel lift piers and replace with new 4x6 timber fenders (224 LF Total as shown on drawings.) Splice/weld 18-inch extensions on eight 10-inch-diameter steel pipe piles as shown on drawings. Replace 18 existing cleats and two missing cleats with 20 new, 18-inch steel cleats on two concrete floating piers. Upgrade 2 60-A shore tie receptacles with two 100-A shore tie receptacles and provide and install new shore tie plugs at location shown on drawings. Take before and after soundings to determine quantity of material dredged. Provide price for overdredged material from project area. Total payable quantity of overdredged material allowed is 1500cy. Cost estimate: $25,000 to $100,000. Unrestricted. When available, this solicitation can be downloaded from the USCG CEU Cleveland web-site at: http://www.uscg.mil/mlclant/ceucleveland. Call 216-902-6222 for information on current bid opening, due dates for quotes, or amendments. Contact Carolyln Melton, contract specialist, 216-902-6275; USCG Civil Engineering Unit Cleveland, 1240 East 9th Street, Cleveland, OH, 44199-2060.



CONTRACT AWARD, OHIO



DACW49-00-C-0007. DREDGING, MAUMEE RIVER. Awarded to MCM Marine Inc. for $858,632 on March 27, 2000. Contact: Mary E. Price, contracting officer, 716-879-4252; Buffalo District, COE.



WEST VIRGINIA



DACW69-00-B-0004. Bid opening April 18, 2000. CHANNEL MAINTENANCE DREDGING ON THE OHIO RIVER TRIBUTARIES. Rental of dredging plant and equipment with operators and all operating supplies. Cost estimate $100,000 to $250,000. 100 percent small business setaside. No charge for plans and specifications. Contact: Sandy King, contract specialist, 304-529-5620. Huntington District Corps of Engineers, 502 Eighth Street, Huntington, WV 25701-2070.



WISCONSIN



DACW35-00-B-0003. Bid opening Feb. 17, 2000, 2 p.m. Specs issued Jan. 6, 2000. MAINTENANCE DREDGING OF DULUTH/SUPERIOR HARBOR, MINNESOTA/WISCONSIN. The project consists of dredging approximately 89,000 cubic yards. Cost estimate between is $500,000.00 and $1,000,000. Unrestricted. Period of performance is 90 calendar days. This procurement will be available for no charge on CD-ROM only. All programs and software necessary to view documents are contained on each CD. Computer requirements to view documents: PC with Windows 3.1 or later. There is no charge for the CD. Requests for the solicitation may be mailed or faxed to 313-226-2209. Contact Bill Bruss, 313-226-3648. U.S. Army Engineer District, Detroit, 477 Michigan Ave, Detroit, MI 48226.



DACW35-00-B-0014. Bid opening April 7, 2000. FY-2000 MAINTENANCE DREDGING, GREEN BAY. Dredge approximately 117,000 cubic yards of material, and all related work. Cost estimate $1 million to $5 million. 100 percent small business setaside. Documents will be issued on CD-ROM. Request documents by fax from: 313-226-2209, at no charge. Contact: Deborah Butler, 313-116-6474; Detroit District, COE, 477 Michigan Ave, Detroit, MI 48226.



MISSISSIPPI VALLEY



ARKANSAS



DACW66-00-B-0014. Bid opening May 2, 2000. LEASE OF ONE CUTTERHEAD, HYDRAULIC PIPELINE DREDGE, FULLY OPERATED, WITH ATTENDANT PLANT, AND SNAGGING EQUIPMENT TO PERFORM WORK ON THE WHITE RIVER. Lease of one cutterhead hydraulic pipeline dredge of not less than 18 inch pump discharge and not less than 1,200 brake horsepower and necessary snagging equipment. The dredge and snagging equipment will be used to make or enlarge dredge cuts, remove snags, construct fills, and otherwise maintain the navigation channel between Mile 9.8 and Mile 260 on the White River. The contractor will also provide a survey boat and perform before and after dredging hydrographic surveys at each dredging location to document dredge production. Work is expected to begin on or about June 1, 2000. Cost estimate, $1 million to $5 million. 100 percent small business setaside. The official copy of the solicitation will be provided on compact disc at no charge. Compact disc may be ordered via fax at 901-544-3142. Contact: Wendell Norman, contract specialist, phone 901-544-0775; Memphis District, Corps of Engineers, 167 N Main St, Rm B202, Attn: CEMVM-CT, Memphis, TN 38103-1894.



LOUISIANA



(All bid opening dates are tentative.)



DACW29-00-B-0048. Bid opening Feb. 28, 2000. FLOOD CONTROL OF THE MISSISSIPPI RIVER AND TRIBUTARIES, MISSISSIPPI DELTA REGION, DAVIS POND FRESHWATER DIVERSION PROJECT, CONTRACT 2B, ST. CHARLES PARISH. Contact Contract Specialist, Sheila Enclade, 504-862-1514; New Orleans District, COE, PO Box 60267, New Orleans, LA 70160.



DACW29-00-B-0054. Bid opening April 3, 2000. MISSISSIPPI RIVER, BATON ROUGE TO GULF OF MEXICO. FY-00, CUTTERHEAD DREDGE RENTAL, SALTWATER BARRIER SILL, PLAQUEMINES PARISH. The contractor's plant will primarily be used in connection with the construction of a saltwater barrier sill located between miles 65.0 and 63.0 above Head of Passes (AHP) on the Mississippi River in water deeper than -45 feet NGVD. The work consists of satisfactorily placing hydraulically dredged material which will be taken from a borrow area on the river bottom. The contract drawings show the anticipated location and configuration of the sill and borrow area. Further details of the location and size of the sill and borrow area required will be given in the dredging assignments. A spill barge with submerged vertical pipe will be used to discharge material below the water surface. The spill barge will be of sufficient size to accommodate a length of vertical discharge pipe able to deliver material to elevations varying from -45 to -60 feet NGVD. Maximum height of the sill will be the point at which the settled dredged material at the disposal area reaches a maximum height of –45 feet NGVD. Approximate dimensions of the sill will be 1,500 feet wide by 1,700 feet long. Contact Sheila Enclade, Contract Specialist, phone: 504-862-1514; New Orleans District, COE, PO Box 60267, New Orleans, LA 70160.



DACW29-00-B-0082. Bid opening April 6, 2000. MERMENTAU RIVER -GULF OF MEXICO, MAINTENANCE DREDGING, C/L STA. -18+00 TO C/L STA. 260+00, MILE 6.5 TO MILE 1.2, CAMERON PARISH, LOUISIANA ED-99-062. Removal and satisfactory disposal of all material from the Mermentau River Navigation Channel within the limits of work as shown on the contract drawings. Unrestricted. Contact: Valerie Sanders, phone: 504 - 862-1493; new Orleans District, COE, PO Box 60267, New Orleans, LA 70160.



DACW29-00-B-0046. Bid opening April 19, 2000. LOWER ATCHAFALAYA RIVER, HORSESHOE CREW BOAT CUT, AND AVOCA ISLAND CUTOFF, CUTTERHEAD DREDGE RENTAL NO. 1-00, TERREBONNE AND ST. MARY PARISHES, SPECIFICATION NO. OM-00-225. Issued Jan. 14, 2000.



DACW29-00-B-0080. Bid opening April 25, 2000. PASSES OF THE MISSISSIPPI RIVER, SOUTHWEST PASS, NO. 00-2, APPROX MILE 3.5 AHP TO APPROX MILE 19.5 BHP; APPROX C/L STA. 300+00 TO APPROX. C/L STA. 1094+00. (NON-CONTINUOUS) Issued Feb. 11, 2000.



DACW29-00-B-0110. MAINTENANCE DREDGING, CUTTERHEAD DREDGE RENTAL, FY-00, THREE RIVERS, OLD RIVER LOCK FOREBAY AND TAILBAY, BATON ROUGE HARBOR (DEVIL'S SWAMP), PORT ALLEN LOCK FOREBAY AND BAYOU PEROT (OM-00-165). Furnish one fully crewed and equipped pipeline cutterhead dredge and auxiliary/attendant plant including 7,000 l.f. of floating and/or submerged pipeline, and a bucket dredge to excavate behind the lock walls at Port Allen Lock, all on a lease basis. Work will be performed at Port Allen Lock forebay, Three Rivers, Baton Rouge Harbor (Devil's Swamp), and Old River Lock forebay and tailbay and GIWW at Bayou Perot. Unrestricted. Contact: Contract Specialist Mary Catherine Renaud, phone 50-862-2888; New Orleans District, COE, PO Box 60267, New Orleans, LA 70160.



POSTPONED, NOT YET ISSUED, OR TO BE ESTABLISHED



DACW29-00-B-0002. MISSISSIPPI RIVER GULF OUTLET, MAIN DREDGING, ST. BERNARD PARISH. Issued Dec. 8, 1999.



DACW29-00-B-0004. MISSISSIPPI RIVER SOUTHWEST PASS (SWP) HOPPER DREDGE RENTAL NUMBER 1-00.. Issued Oct. 22, 1999.



DACW29-00-0006. MISSISSIPPI RIVER SOUTHWEST PASS (SWP) HOPPER DREDGE RENTAL NUMBER 2-00. Issued Oct. 22, 1999.



DACW29-00-B-0007. MISSISSIPPI RIVER SOUTHWEST PASS (SWP) HOPPER DREDGE RENTAL NUMBER 3-00. Issued Oct. 22, 1999.



DACW29-00-B-0008. MISSISSIPPI RIVER SOUTHWEST PASS (SWP) HOPPER DREDGE RENTAL NUMBER 4-00. Issued Oct. 22, 1999.



DACW29-00-B-0009. Mississippi River Southwest Pass (SWP) Hopper Dredge Rental Number 5-00. Issued 10/22/99.



DACW29-00-B-0011. MISSISSIPPI RIVER SOUTHWEST PASS (SWP) HOPPER DREDGE RENTAL NUMBER 6-00. Issued Oct. 22, 1999.



DACW29-00-B-0012. MISSISSIPPI RIVER SOUTHWEST PASS (SWP) HOPPER DREDGE RENTAL NUMBER 7-00. Issued Oct. 22, 1999.



DACW29-00-B-0013. MISSISSIPPI RIVER SOUTHWEST PASS (SWP) HOPPER DREDGE RENTAL NUMBER 8-00. Issued Oct. 22, 1999.



DACW29-00-B-0014. MISSISSIPPI RIVER SOUTHWEST PASS (SWP) HOPPER DREDGE RENTAL NUMBER 9-00. Issued Oct. 22, 1999.



DACW29-00-B-0017. MISSISSIPPI RIVER GULF OUTLET, MAINTENANCE DREDGING, C/L STA. 2852+00 to C/L Station 3660+00, Mile 12