News and information for the worldwide dredging industry

Bookmark and Share Email this page Email Print this page Print

January/February 2017 - Contracts

Poplar Expansion Sand Stockpile 2016, Paul S. Sarbanes Ecosystem Restoration Project, Poplar Island, Talbot County, Maryland. To Norfolk Dredging Company for $7,088,500 on July 6, 2016 by the Baltimore Engineer District. W912DR-16-B-0014/ W912DR-16-B-0014

Hydrographic Survey Boat. To Ross Labs, LLC for $643,550 on September 30, 2016 by the St. Paul Engineer District. W912ES-16-R-0004/ W912ES-16-C-0011

Construction Operations for the Indiana Harbor Canal(IHC), Confined Disposal Facility(CDF), East Chicago, Indiana. To Kokosing Construction Company/O’Brien & Gere J.V. for $55,509,303, base year items, on September 30, 2016 by the Chicago Engineer Dis-trict. W912P6-16-R-0031/ W912P6-16-D-0004

A&E Services, Mapping and Surveying IDIQ Contract. To Chustz Surveying Inc. for $5,000,000 on October 3, 2016 by the Memphis Engineer District. W912EQ-15-R-0008/ W912EQ-16-D-0007

Mid-Stream #2 Diesel Fuel Delivery to Dredge Goetz. To MERS, LLC for $103,477.50 on October 13, 2016 by the St. Paul Engineer District. W912ES-17-T-0003/ W912ES-17-P-000

U.S. Naval Station Mayport, Florida Maintenance Dredging, 50-Foot Project Entrance Channel and Harbor Complex. To Great Lakes Dredge & Dock Co., LLC for $9,474,000, line items 1 through 12, on November 5, 2016 by the Jacksonville Engineer District. GROUP4-10-R-J030/ GROUP4-10-R-J030

Banana River Channel Maintenance Dredging. To Florida Dredge & Dock, LLC for $5,945,000 on November 7, 2016 by the National Aeronautics and Space Administration, Office of Procurement. NNK16594696R/ NNK17CA10C

Lease of One Cutterhead, Hydraulic Pipe-line Dredge (not less than 22-inch diameter), Fully Operated with Attendant Plant and Personnel, with a Draft Not to Exceed Nine Feet, for Construction and Maintenance Dredging. To Inland Dredging Company, LLC for $3,216,000, line item 1, on November 15, 2016 by the Vicksburg Engineer District. W912EE-16-B-0005/ W912EE-16-B-0005

​Hurricane Storm Damage Risk Reduction System (HSDRRS) works in the Lake Pontchartrain and Vicinity (LPV), LPV Mitigation, New Zydeco Ridge, Flood Side BLH-Wet & Brackish Marsh Restoration, St. Tammany Parish, Louisiana. To Crosby Dredging, LLC for $13,126,775 on November 18, 2016 by the New Orleans Engineer District. W912P8-16-B-0027/ W912P8-17-C-0004

Sagamore Creek Maintenance Dredging. To Prock Marine Company for $542,970, line items 1 through 2AB, on November 18, 2016 by the New England Engineer District. W912WJ-16-B-0008/ W912WJ-17-C-0001

Wastewater Lagoon Sludge Removal for Bob Shetler Recreation Area Lagoons at Saylorville Lake Project, Johnston, Iowa. To A-1 Pump & Jet Services Inc. for $36,225 on November 21, 2016 by the Rock Island Engineer District. W912EK-17-T-0001/ W912EK-17-P-0009

CPP Control System Repair for Dredge McFar-land. To MCR Engineering Inc. for $33,358.17 on November 22, 2016 by the Philadelphia Engineer District. W912BU-17-P-0011
Dredge Material Management Area O-7, Okeechobee Waterway, Martin County, Florida. To Herve Cody Contractor for $4,357,044 on November 23, 2016 by Jacksonville Engineer District. W912EP-16-R-0019/ W912EP-16-R-0019

Design-Bid-Build (DBB) Structural Repairs at Berths 11A, 11B, and 11C, Portsmouth Naval Shipyard, Kittery, Maine. To Cianbro Corp. for $28,860,243 on November 30, 2016 by the Department of the Navy, Naval Facilities Engineering Command. N40085-16-R-3011/ N40085-16-R-3011

Little River Vibraocre Testing, Horry County, South Carolina. To American Vibracore Services for $71,952, line item 1, on December 1, 2016 by the Wilmington Engineer District. W912PM-17-T-0003/ W912PM-17-P-0007

Add your comment:
Edit Module