Dredging Contract Awards, November 2, 2011 to January 6, 2012

5000 Feet of HDPE Pipe. To Range Industrial Supply for $222,891.80, on November 2, 2011 by the St. Paul District, Corps of Engineers. W912ES-12-P-0012/W912ES-12-T-0005

Maintenance Dredging of Pensacola Harbor Entrance Channel, Pensacola, Florida (Escambia and Santa Rosa Counties). To Weeks Marine, Inc. for $3,426,243, on November 3, 2011 by the Mobile District, Corps of Engineers. W91278-12-C-0001/W91278-12-B-0001

Development of Parallel System Capabilities, Enhanced Reporting Capabilities, and Initial Work to Support Changes to RMS and Use of GIS for the National Navigation Operation & Management Performance Evaluation & Assessment System. To RJP Consulting Services for $149,200, CLIN 1 through 6, on September 23, 2011 by the U.S. Army Corps of Engineers HEC, Ft. Belvoir. W912HQ-11-P-0170/W912HQ-11-T-0034

Maintenance of the Dredging Information System (DIS) and Lock Performance Monitoring System (LPMS). To RJP Consulting Services for $148,500, CLIN 1 and 2, on September 20, 2011 by the U.S. Army Corps of Engineers HEC, Ft. Belvoir. W912HQ-11-P-0188/W912HQ-11-T-0029

Maintenance Dredging of Sandy Hook Channel and Main Ship Channel, in the New York Harbor Federal Navigation Project. To Weeks Marine, Inc. for $4,168,596.25, line items 1 through 3 and 6, on November 10, 2011 by the New York Engineer District. W912DS-12-C-0002/W912DS-11-B-0011

5,000 Gallons Lube Oil for Dredge McFarland. To Papco, Inc. for $34,200, line item 1, on November 9, 2011 by the Philadelphia Engineer District. W912BU-12-P-0034/W912BU-12-T-0005

Dredging of Federal Channel in the Chelsea River in the Vicinity of the Chelsea Street Bridge, East Boston and Chelsea, Massachusetts. To Great Lakes Dredge & Dock Company LLC for $4,649,500, line items 1 through 8, on November 16, 2011 by the New England Engineer District. W912WJ-12-C-0001/W912WJ-11-B-0010. The project would create a minimum 140 to 175-foot-wide channel in the vicinity of the new Chelsea Street Bridge, removing approximately 34,700 cy of dredged material which includes two feet of overdepth using a mechanical dredge. The contract includes dredging to widen the channel as well as the removal of an abandoned 930-ton concrete counterweight.

65,000 Gallons of # 2, Diesel Fuel Oil for the Dredge McFarland at Fort Mifflin Dock, Mifflin Range of the Delaware River, Philadelphia, Pennsylvania. To Plaza Fueling Agents for $216,450, line item 1, on November 22, 2011 by the Philadelphia Engineer District. W912BU-12-P-0034 /W912BU-12-T-0005

Dredging Houston Ship Channel - Redfish to Bayport, Harris and Chambers County Texas, Pipeline Dredging. To Great Lakes Dredge & Dock Company LLC for $7,756,320, line items 1 through 4, on November 22, 2011 by the Galveston Engineers District. W912HY-12-C-0002/W912HY-12-B-0002

50,000 gallons of #2 Dyed Diesel Fuel for the Dredge Goetz in Fountain City, Wisconsin. To Wilson Oil Company for $174,900, line item 1, on November 22, 2011 by the St. Paul Engineer District. W912ES-12-P-0024 /W912ES-12-T-0026

Dredge Goetz Primary Generator Set Top End Overhaul. To Brennan Diesel for $155,991 on November 21, 2011 by the St. Paul Engineer District. W912ES-12-P-0023/W912ES-12-T-0012

Purchase and delivery of 2,160 feet of abrasion resistant spiral butt-welded pipe for the U.S. Dredge Goetz Michigan pipeline replacement. Shipping charges must be included in the pricing. The steel pipe must be delivered to Fountain City, Wisconsin. To Range Industrial Supply for $130,507.20 on November 25 by the St. Paul Engineer District. W912ES-12-P-0022/W912ES-12-T-0019

USCG Station Jonesport, Maine Dredging. Remove 6,700 cy of material on the Mousabec Reach Waterway and dispose of it at the offshore Mark Island disposal site and incidental related work. To Burnham Associates for a total lump sum bid of $388,450 on December 6, 2011 by the USCG Civil Engineering Unit Providence. HSCGG1-12-C-PRV031/HSCGG1-12-B-PRV031

FY12 Maintenance Dredging Wilmington Harbor Outer Ocean Bar & Mid-River, New Hanover and Brunswick Counties, North Carolina. To Great Lakes Dredge & Dock Company LLC for $9,698,000, line items
1 through 9AC, on December 14, 2011 by the Wilmington Engineer District. W912PM-12-C-0001/W912PM-11-B-0005

Purchase and delivery of overhaul engine parts for M/V Fiedler located in Fountain City, Wisconsin. Once awarded, vendor will need to deliver the engine parts within two weeks. To Tiger Solutions International, LLC for $18,409.93, line item 1, on December 14, 2011 by the St. Paul Engineer District. W912ES-12-P-0029/W912ES-12-T-0021

Freeport Harbor, Brazoria County, Texas Entrance Channel, Jetty Channel and Lower Turning Basin Hopper Dredging. To Manson Construction Company for $3,765,050 by the Galveston Engineer District. W912HY-12-C-0003/ W912HY-12-B-0001

Savannah and Brunswick Inner Harbor Maintenance Dredging. To Marinex Construction Inc. for $10,648,750 on December 30, 2011 by the Savannah Engineer District. W912HN-12-D-0002/W912HN-11-B-0002

Shore Protection Project, St. Johns County, Florida Beach Re-nourishment 2012, St. Augustine Beach. To Marinex Construction, Inc. for $12,544,500, line items 1 through 5, on January 6, 2012 by the Jacksonville Engineer District. W912EP-12-C-0004/ W912EP12-B-0001